Lead Paint Risk in Bear River, WY

10.5%Pre-1978 Housing
31Pre-1978 Units
295Total Housing Units
LowRisk Level

How Bear River Compares

Bear River
10.5%!<(MISSING)/span>
Wyoming
49.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Bear River Residents

Most housing in Bear River was built after 1978 (89.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Bear River

Get a more detailed risk assessment for a specific address.