Lead Paint Risk in Bar Nunn, WY
16.0%Pre-1978 Housing
161Pre-1978 Units
1,004Total Housing Units
LowRisk Level
How Bar Nunn Compares
What This Means for Bar Nunn Residents
Most housing in Bar Nunn was built after 1978 (84.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Bar Nunn
Get a more detailed risk assessment for a specific address.