Lead Paint Risk in Tainter Lake, WI
46.2%Pre-1978 Housing
584Pre-1978 Units
1,264Total Housing Units
ElevatedRisk Level
How Tainter Lake Compares
What This Means for Tainter Lake Residents
Tainter Lake has an elevated level of pre-1978 housing (46.2%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Tainter Lake
Get a more detailed risk assessment for a specific address.