Lead Paint Risk in St. Croix Falls, WI
55.4%Pre-1978 Housing
622Pre-1978 Units
1,122Total Housing Units
ElevatedRisk Level
How St. Croix Falls Compares
What This Means for St. Croix Falls Residents
St. Croix Falls has an elevated level of pre-1978 housing (55.4%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in St. Croix Falls
Get a more detailed risk assessment for a specific address.