Lead Paint Risk in Hewitt, WI

43.8%Pre-1978 Housing
152Pre-1978 Units
347Total Housing Units
ElevatedRisk Level

How Hewitt Compares

Hewitt
43.8%!<(MISSING)/span>
Wisconsin
57.8%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Hewitt Residents

Hewitt has an elevated level of pre-1978 housing (43.8%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Hewitt

Get a more detailed risk assessment for a specific address.