Lead Paint Risk in Herbster, WI
42.6%Pre-1978 Housing
95Pre-1978 Units
223Total Housing Units
ElevatedRisk Level
How Herbster Compares
What This Means for Herbster Residents
Herbster has an elevated level of pre-1978 housing (42.6%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Herbster
Get a more detailed risk assessment for a specific address.