Lead Paint Risk in Bellevue, WI

18.5%Pre-1978 Housing
1,334Pre-1978 Units
7,199Total Housing Units
LowRisk Level

How Bellevue Compares

Bellevue
18.5%!<(MISSING)/span>
Wisconsin
57.8%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Bellevue Residents

Most housing in Bellevue was built after 1978 (81.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Bellevue

Get a more detailed risk assessment for a specific address.