Lead Paint Risk in Bellevue, WI
18.5%Pre-1978 Housing
1,334Pre-1978 Units
7,199Total Housing Units
LowRisk Level
How Bellevue Compares
What This Means for Bellevue Residents
Most housing in Bellevue was built after 1978 (81.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Bellevue
Get a more detailed risk assessment for a specific address.