Lead Paint Risk in Pacific Beach, WA
0.0%Pre-1978 Housing
0Pre-1978 Units
112Total Housing Units
LowRisk Level
How Pacific Beach Compares
What This Means for Pacific Beach Residents
Most housing in Pacific Beach was built after 1978 (100.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Pacific Beach
Get a more detailed risk assessment for a specific address.