Lead Paint Risk in Orchards, WA
17.5%Pre-1978 Housing
1,815Pre-1978 Units
10,384Total Housing Units
LowRisk Level
How Orchards Compares
What This Means for Orchards Residents
Most housing in Orchards was built after 1978 (82.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Orchards
Get a more detailed risk assessment for a specific address.