Lead Paint Risk in Maple Valley, WA

8.7%Pre-1978 Housing
827Pre-1978 Units
9,553Total Housing Units
LowRisk Level

How Maple Valley Compares

Maple Valley
8.7%!<(MISSING)/span>
Washington
44.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Maple Valley Residents

Most housing in Maple Valley was built after 1978 (91.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Maple Valley

Get a more detailed risk assessment for a specific address.