Lead Paint Risk in Kenmore, WA

42.8%Pre-1978 Housing
4,010Pre-1978 Units
9,362Total Housing Units
ElevatedRisk Level

How Kenmore Compares

Kenmore
42.8%!<(MISSING)/span>
Washington
44.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Kenmore Residents

Kenmore has an elevated level of pre-1978 housing (42.8%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Kenmore

Get a more detailed risk assessment for a specific address.