Lead Paint Risk in Kendall, WA

19.6%Pre-1978 Housing
56Pre-1978 Units
286Total Housing Units
LowRisk Level

How Kendall Compares

Kendall
19.6%!<(MISSING)/span>
Washington
44.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Kendall Residents

Most housing in Kendall was built after 1978 (80.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Kendall

Get a more detailed risk assessment for a specific address.