Lead Paint Risk in Issaquah, WA
18.2%Pre-1978 Housing
3,127Pre-1978 Units
17,180Total Housing Units
LowRisk Level
How Issaquah Compares
What This Means for Issaquah Residents
Most housing in Issaquah was built after 1978 (81.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Issaquah
Get a more detailed risk assessment for a specific address.