Lead Paint Risk in Nellysford, VA
11.0%Pre-1978 Housing
91Pre-1978 Units
825Total Housing Units
LowRisk Level
How Nellysford Compares
What This Means for Nellysford Residents
Most housing in Nellysford was built after 1978 (89.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Nellysford
Get a more detailed risk assessment for a specific address.