Lead Paint Risk in McNair, VA

3.4%Pre-1978 Housing
326Pre-1978 Units
9,497Total Housing Units
LowRisk Level

How McNair Compares

McNair
3.4%!<(MISSING)/span>
Virginia
44.2%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for McNair Residents

Most housing in McNair was built after 1978 (96.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in McNair

Get a more detailed risk assessment for a specific address.