Lead Paint Risk in Cherry Hill, VA
8.8%Pre-1978 Housing
690Pre-1978 Units
7,885Total Housing Units
LowRisk Level
How Cherry Hill Compares
What This Means for Cherry Hill Residents
Most housing in Cherry Hill was built after 1978 (91.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Cherry Hill
Get a more detailed risk assessment for a specific address.