Lead Paint Risk in Stowe, VT
56.8%Pre-1978 Housing
314Pre-1978 Units
553Total Housing Units
ElevatedRisk Level
How Stowe Compares
What This Means for Stowe Residents
Stowe has an elevated level of pre-1978 housing (56.8%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Stowe
Get a more detailed risk assessment for a specific address.