Lead Paint Risk in Santaquin, UT

15.8%Pre-1978 Housing
673Pre-1978 Units
4,273Total Housing Units
LowRisk Level

How Santaquin Compares

Santaquin
15.8%!<(MISSING)/span>
Utah
36.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Santaquin Residents

Most housing in Santaquin was built after 1978 (84.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Santaquin

Get a more detailed risk assessment for a specific address.