Lead Paint Risk in Salem, UT

18.2%Pre-1978 Housing
508Pre-1978 Units
2,795Total Housing Units
LowRisk Level

How Salem Compares

Salem
18.2%!<(MISSING)/span>
Utah
36.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Salem Residents

Most housing in Salem was built after 1978 (81.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Salem

Get a more detailed risk assessment for a specific address.