Lead Paint Risk in Peter, UT

17.1%Pre-1978 Housing
22Pre-1978 Units
129Total Housing Units
LowRisk Level

How Peter Compares

Peter
17.1%!<(MISSING)/span>
Utah
36.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Peter Residents

Most housing in Peter was built after 1978 (82.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Peter

Get a more detailed risk assessment for a specific address.