Lead Paint Risk in Fielding, UT

49.4%Pre-1978 Housing
87Pre-1978 Units
176Total Housing Units
ElevatedRisk Level

How Fielding Compares

Fielding
49.4%!<(MISSING)/span>
Utah
36.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Fielding Residents

Fielding has an elevated level of pre-1978 housing (49.4%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Fielding

Get a more detailed risk assessment for a specific address.