Lead Paint Risk in Enterprise, UT

0.0%Pre-1978 Housing
0Pre-1978 Units
135Total Housing Units
LowRisk Level

How Enterprise Compares

Enterprise
0.0%!<(MISSING)/span>
Utah
36.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Enterprise Residents

Most housing in Enterprise was built after 1978 (100.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Enterprise

Get a more detailed risk assessment for a specific address.