Lead Paint Risk in Eden, UT
9.6%Pre-1978 Housing
26Pre-1978 Units
271Total Housing Units
LowRisk Level
How Eden Compares
What This Means for Eden Residents
Most housing in Eden was built after 1978 (90.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Eden
Get a more detailed risk assessment for a specific address.