Lead Paint Risk in Brian Head, UT
11.8%Pre-1978 Housing
137Pre-1978 Units
1,163Total Housing Units
LowRisk Level
How Brian Head Compares
What This Means for Brian Head Residents
Most housing in Brian Head was built after 1978 (88.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Brian Head
Get a more detailed risk assessment for a specific address.