Lead Paint Risk in Alpine, UT

15.3%Pre-1978 Housing
480Pre-1978 Units
3,133Total Housing Units
LowRisk Level

How Alpine Compares

Alpine
15.3%!<(MISSING)/span>
Utah
36.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Alpine Residents

Most housing in Alpine was built after 1978 (84.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Alpine

Get a more detailed risk assessment for a specific address.