Lead Paint Risk in Uhland, TX
15.7%Pre-1978 Housing
110Pre-1978 Units
702Total Housing Units
LowRisk Level
How Uhland Compares
What This Means for Uhland Residents
Most housing in Uhland was built after 1978 (84.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Uhland
Get a more detailed risk assessment for a specific address.