Lead Paint Risk in Tyler, TX
52.8%Pre-1978 Housing
23,985Pre-1978 Units
45,461Total Housing Units
ElevatedRisk Level
How Tyler Compares
What This Means for Tyler Residents
Tyler has an elevated level of pre-1978 housing (52.8%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Tyler
Get a more detailed risk assessment for a specific address.