Lead Paint Risk in Southside Place, TX
9.5%Pre-1978 Housing
74Pre-1978 Units
777Total Housing Units
LowRisk Level
How Southside Place Compares
What This Means for Southside Place Residents
Most housing in Southside Place was built after 1978 (90.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Southside Place
Get a more detailed risk assessment for a specific address.