Lead Paint Risk in Southside Place, TX

9.5%Pre-1978 Housing
74Pre-1978 Units
777Total Housing Units
LowRisk Level

How Southside Place Compares

Southside Place
9.5%!<(MISSING)/span>
Texas
34.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Southside Place Residents

Most housing in Southside Place was built after 1978 (90.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Southside Place

Get a more detailed risk assessment for a specific address.