Lead Paint Risk in Seguin, TX
44.4%Pre-1978 Housing
5,585Pre-1978 Units
12,565Total Housing Units
ElevatedRisk Level
How Seguin Compares
What This Means for Seguin Residents
Seguin has an elevated level of pre-1978 housing (44.4%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Seguin
Get a more detailed risk assessment for a specific address.