Lead Paint Risk in San Elizario, TX

8.3%Pre-1978 Housing
269Pre-1978 Units
3,257Total Housing Units
LowRisk Level

How San Elizario Compares

San Elizario
8.3%!<(MISSING)/span>
Texas
34.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for San Elizario Residents

Most housing in San Elizario was built after 1978 (91.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in San Elizario

Get a more detailed risk assessment for a specific address.