Lead Paint Risk in Poteet, TX
59.4%Pre-1978 Housing
595Pre-1978 Units
1,001Total Housing Units
ElevatedRisk Level
How Poteet Compares
What This Means for Poteet Residents
Poteet has an elevated level of pre-1978 housing (59.4%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Poteet
Get a more detailed risk assessment for a specific address.