Lead Paint Risk in Pelican Bay, TX
19.7%Pre-1978 Housing
168Pre-1978 Units
854Total Housing Units
LowRisk Level
How Pelican Bay Compares
What This Means for Pelican Bay Residents
Most housing in Pelican Bay was built after 1978 (80.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Pelican Bay
Get a more detailed risk assessment for a specific address.