Lead Paint Risk in Peaster, TX
18.9%Pre-1978 Housing
28Pre-1978 Units
148Total Housing Units
LowRisk Level
How Peaster Compares
What This Means for Peaster Residents
Most housing in Peaster was built after 1978 (81.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Peaster
Get a more detailed risk assessment for a specific address.