Lead Paint Risk in Ovilla, TX
18.2%Pre-1978 Housing
282Pre-1978 Units
1,547Total Housing Units
LowRisk Level
How Ovilla Compares
What This Means for Ovilla Residents
Most housing in Ovilla was built after 1978 (81.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Ovilla
Get a more detailed risk assessment for a specific address.