Lead Paint Risk in McKinney, TX

8.3%Pre-1978 Housing
6,162Pre-1978 Units
74,436Total Housing Units
LowRisk Level

How McKinney Compares

McKinney
8.3%!<(MISSING)/span>
Texas
34.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for McKinney Residents

Most housing in McKinney was built after 1978 (91.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in McKinney

Get a more detailed risk assessment for a specific address.