Lead Paint Risk in Manor, TX
4.0%Pre-1978 Housing
238Pre-1978 Units
5,974Total Housing Units
LowRisk Level
How Manor Compares
What This Means for Manor Residents
Most housing in Manor was built after 1978 (96.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Manor
Get a more detailed risk assessment for a specific address.