Lead Paint Risk in Homestead Meadows South, TX
8.5%Pre-1978 Housing
173Pre-1978 Units
2,041Total Housing Units
LowRisk Level
How Homestead Meadows South Compares
What This Means for Homestead Meadows South Residents
Most housing in Homestead Meadows South was built after 1978 (91.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Homestead Meadows South
Get a more detailed risk assessment for a specific address.