Lead Paint Risk in Garza-Salinas II, TX

10.8%Pre-1978 Housing
22Pre-1978 Units
204Total Housing Units
LowRisk Level

How Garza-Salinas II Compares

Garza-Salinas II
10.8%!<(MISSING)/span>
Texas
34.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Garza-Salinas II Residents

Most housing in Garza-Salinas II was built after 1978 (89.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Garza-Salinas II

Get a more detailed risk assessment for a specific address.