Lead Paint Risk in Devine, TX
52.2%Pre-1978 Housing
941Pre-1978 Units
1,803Total Housing Units
ElevatedRisk Level
How Devine Compares
What This Means for Devine Residents
Devine has an elevated level of pre-1978 housing (52.2%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Devine
Get a more detailed risk assessment for a specific address.