Lead Paint Risk in César Chávez, TX

6.6%Pre-1978 Housing
46Pre-1978 Units
699Total Housing Units
LowRisk Level

How César Chávez Compares

César Chávez
6.6%!<(MISSING)/span>
Texas
34.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for César Chávez Residents

Most housing in César Chávez was built after 1978 (93.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in César Chávez

Get a more detailed risk assessment for a specific address.