Lead Paint Risk in Copper Canyon, TX

13.1%Pre-1978 Housing
114Pre-1978 Units
868Total Housing Units
LowRisk Level

How Copper Canyon Compares

Copper Canyon
13.1%!<(MISSING)/span>
Texas
34.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Copper Canyon Residents

Most housing in Copper Canyon was built after 1978 (86.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Copper Canyon

Get a more detailed risk assessment for a specific address.