Lead Paint Risk in Carter, TX

4.8%Pre-1978 Housing
28Pre-1978 Units
579Total Housing Units
LowRisk Level

How Carter Compares

Carter
4.8%!<(MISSING)/span>
Texas
34.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Carter Residents

Most housing in Carter was built after 1978 (95.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Carter

Get a more detailed risk assessment for a specific address.