Lead Paint Risk in Bulverde, TX
12.5%Pre-1978 Housing
318Pre-1978 Units
2,550Total Housing Units
LowRisk Level
How Bulverde Compares
What This Means for Bulverde Residents
Most housing in Bulverde was built after 1978 (87.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Bulverde
Get a more detailed risk assessment for a specific address.