Lead Paint Risk in Bullard, TX

16.1%Pre-1978 Housing
227Pre-1978 Units
1,411Total Housing Units
LowRisk Level

How Bullard Compares

Bullard
16.1%!<(MISSING)/span>
Texas
34.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Bullard Residents

Most housing in Bullard was built after 1978 (83.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Bullard

Get a more detailed risk assessment for a specific address.