Lead Paint Risk in Abram, TX
1.5%Pre-1978 Housing
7Pre-1978 Units
456Total Housing Units
LowRisk Level
How Abram Compares
What This Means for Abram Residents
Most housing in Abram was built after 1978 (98.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Abram
Get a more detailed risk assessment for a specific address.