Lead Paint Risk in Santee, SC
18.1%Pre-1978 Housing
90Pre-1978 Units
498Total Housing Units
LowRisk Level
How Santee Compares
What This Means for Santee Residents
Most housing in Santee was built after 1978 (81.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Santee
Get a more detailed risk assessment for a specific address.