Lead Paint Risk in Reidville, SC
17.8%Pre-1978 Housing
128Pre-1978 Units
718Total Housing Units
LowRisk Level
How Reidville Compares
What This Means for Reidville Residents
Most housing in Reidville was built after 1978 (82.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Reidville
Get a more detailed risk assessment for a specific address.