Lead Paint Risk in Piedmont, SC

43.3%Pre-1978 Housing
910Pre-1978 Units
2,102Total Housing Units
ElevatedRisk Level

How Piedmont Compares

Piedmont
43.3%!<(MISSING)/span>
South Carolina
33.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Piedmont Residents

Piedmont has an elevated level of pre-1978 housing (43.3%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Piedmont

Get a more detailed risk assessment for a specific address.