Lead Paint Risk in Fairview Crossroads, SC

14.2%Pre-1978 Housing
47Pre-1978 Units
332Total Housing Units
LowRisk Level

How Fairview Crossroads Compares

Fairview Crossroads
14.2%!<(MISSING)/span>
South Carolina
33.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Fairview Crossroads Residents

Most housing in Fairview Crossroads was built after 1978 (85.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Fairview Crossroads

Get a more detailed risk assessment for a specific address.