Lead Paint Risk in Naranjito zona urbana, PR

46.5%Pre-1978 Housing
607Pre-1978 Units
1,304Total Housing Units
ElevatedRisk Level

How Naranjito zona urbana Compares

Naranjito zona urbana
46.5%!<(MISSING)/span>
Puerto Rico
53.2%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Naranjito zona urbana Residents

Naranjito zona urbana has an elevated level of pre-1978 housing (46.5%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Naranjito zona urbana

Get a more detailed risk assessment for a specific address.